Maharashtra State Road Development Corporation Ltd.
Transforming Maharashtra's Transport Landscape
Modernization and Computerization of Thirty Two (32) Integrated Inter State Border Check Posts in the State of Maharashtra

Project Background (Location)

The Government has decided to carry out Modernization and Computerization of 32 Border Check Posts in total, which includes 24 border check posts of Transport Department and 8 new border check posts of Sales Tax & State Excise Department.
List of 24 Border Check Post
S.No.Type of BCPPlaceTalukaDistrictRoad detailsAdjoining statePresent Status
1MajorDapacharyTalasariThaneNH 8Gujarat In Operation
2MajorHaddakhedShirpurDhuleNH 3M.P.In Operation
3MajorNavapurNavapurNandurbarNH 6GujaratIn Operation
4BigKagalKagalKolhapurNH 4KarnatakIn Progress
5BigDeoriDeoriGondiaNH 6ChhatisgadIn Progress
6MediumOmergaOmergaOsmanabadNH 9KarnatakIn Operation
7MediumMandrupSouth SolapurSolapurNH 13KarnatakIn Operation
8MediumPimpalkuttiPandharkawadaYeotmalNH 7Andhra PradeshIn Operation
9MediumManegaonRamtekNagpurNH 7Madhya PradeshIn Operation
10MediumBandaSavantwadiSindhudurgaNH 17GoaNot yet started
11MediumMarawadeMangalvedhaSolapurNH 9KarnatakNot yet started
12MediumSaonerSaonerNagpurNH 69Madhya PradeshIn Operation
13SmallPurnadMuktainagarJalgaonSH 8Madhya PradeshIn Progress
14SmallBorgaonSurganaNasikSH 23GujaratIn Progress
15SmallRajuraRajuraChandrapurSH 264Andhra PradeshIn Progress
16SmallBiloliBiloliNandedSH 225Andhra PradeshIn Progress
17SmallChorwadRaverJalgaonSH 4Madhya PradeshNot yet started
18SmallDeglurDeglurNandedSH 6Andhra PradeshNot yet started
19SmallKhapriChandur bazarAmravatiSH 6Madhya PradeshIn Progress
20SmallAkkalkuaAkkalkuaNandurbarSH 4GujratIn Progress
21SmallShinoliChandgadKolhapurSH 121KarnatakIn Progress
22SmallWarudWarudAmravatiSH 244Madhya PradeshIn Operation
23Small PethPethNasikNH 848Gujarat Not yet started
24Small ChindwadaChindwadaNagpurNH 26BMadhya Pradesh In Progress
List of locations for 8 Eight Sales Tax Check Post
  • J N P T (Sea Port) Raigad
  • M B P T ( Sea Port) Mumbai
  • Kalamboli (railway C.P) Mumbai
  • Mulund (railway C.P) Mumbai
  • Panvel (railway C.P) Raigad
  • Jogeshwari (railway C.P) Mumbai
  • Airport Mumbai Sahar Cargo Complex
  • Nagpur Air Cargo Complex (Proposed)

Project features/ details/contractor detail/technical details

Name of the project : Modernization and computerization of Integrated Border Check Posts at 24 (Twenty-Four) locations in the state of Maharashtra on Build Operate & Transfer (BOT) basis
Contractor (Concessionaire) Concession Agreement : Maharashtra Border Check Post Network Limited.(MBCPNL)
Between Transport Department & MBCPNL
Work Order Details : MSRDC letter no MSRDC/02/BCP/1939 dated 05.05.2009
Commencement Date : 05.05.2009
Concession Period : 24 years 6 months.(Including construction period of 18 months)
Independent Consultant : SAI consulting Engineers, Ahmadabad


The Modernised and Computerised Border Check-Posts will have the following features:-
  • Admin Building
  • Transport office
  • Operator Booths
  • Parking Area
  • Godowns
  • Detention Yard
  • Hostel with Mess (Dormitory , Three person sharing, single occupying )
  • Residential quarters
  • Toilet Blocks
  • Electronic weigh bridges
  • Video-Surveillance
  • Automatic vehicle identification
  • Computers and Hardware
  • High - Mast yard illumination
  • Electronic and electrical equipments
  • Check-post software
  • Dhaba/Eateries
  • Puncture Repairing Shop
  • General Stores
  • Medical Stores
  • Dormitory / Rest Room for vehicle drivers
  • STD/PCO/Cyber Café
  • Cassettes/C.D.s shop
  • Auto Mechanical/Wring/Electrical Repairing Workshop

Project Cost

Project Cost : 1000.00 crore

The Modernisation and Computerisation of Border Check-Posts will achieve the following objectives: -

  • Clearance through 100% full-proof checking
  • Solution to hassle-free and speedier clearance
  • Reduction in down-time from entry to exit
  • As the functions of three departments (Transport, Sales-Tax and State Excise) clubbed together under one-roof, it will be respite for the transporters from cumbersome and time-consuming clearance procedures.

Project Current Status

Out of the total of 24 Border Check-Posts, 9 Border Check-Posts are already operational. In case of remaining Border Check-Posts, all-out efforts are being made to make them operational as fast as possible.
Among many challenges faced, the major one is the acquisition of encumbrance-fee land.

Map of Project

Map of Project
THE MODEL OF MODERNIZED AND COMPUTERIZED BORDER CHECK-POST
THE ‘BENCHMARK’ PROJECT OF MAHARASHTRA STATE